Acquisition of further NSW solar and battery sites

Birdwood supports its Joint Venture partner Victory Hill with the acquisition of two ready to build solar and battery farms in NSW.

This acquisition adds two 4.95MW solar PV sites in NSW to the programme, with co-located 11MWh BESS on each site, bringing the total capacity of this portfolio to 37MW/60MWh, across seven assets.

The construction of these two hybrid sites is expected to begin in Q2 2024, with completion expected in early 2025.

Previous
Previous

birdwood flexible report card funding awarded by ARENA

Next
Next

Birdwood investment empowers Energy from behind the meter